Behind the MeterFree reportInteractive

Example site

Texas · ERCOT · Generated 2026-10-05
Behind-the-meter generation is viable here; water permitting is the gate. The site sits 5.59 miles from the Transco M4400 meter with 192.2 MW of available gas headroom, and Texas gas costs run 35% below the national average on Permian and Eagle Ford supply. Two announced behind-the-meter projects totaling up to 1.5 GW nameplate within 7.5 miles confirm anchor-tenant viability. Attainment air status (a 250 tpy NOx PSD trigger) puts the site in the lowest regulatory tier with no NSR offsets required. The watch-item is the VCGCD groundwater moratorium imposed in June 2026, which is blocking water permitting, and the permitting path still lacks an equipment-backed capacity model.
Every report is a shareable link. Send it to your team, a broker, or your IC. Private until you share it.

Run this on your own site

Drop a KMZ, address, or lat-long and get the same interactive analysis back, free. Other topics are coming; talk to us if you want them together.

Get my free report

Generated by Geoforge · example site · This report is for informational purposes only.