Run data center site screening in hours, not weeks.
What used to cost developers, landowners, and brokers weeks and thousands (interconnection, capacity, queue, pricing, time to power) now comes back the same day.
Any site in the USA. Free with a work email.
Power is the first question on every site.
We answer it for everyone.
Power decides which sites are real. Now anyone can check it, on any parcel, for free.
Clarity on 8 power criteria
Power has many facets — from generation to transmission and substation capacity, interconnection, and competitive risk. Geoforge covers eight of them. Here's a real report on an example site.
Site & grid context
POI shortlist with headroom
Interconnection queue reality check
Historical power pricing
Time-to-power inputs
Adjacent generation
Adjacent transmission lines
Planned transmission upgrades
Location in, report out
Drop a location
Upload a KMZ, type an address, or paste a lat-long. No parcel IDs. Sign up with an email and go.
We run the power analysis
8 criteria on our nationwide grid dataset and ERCOT records: POIs, headroom, queue, pricing, generation, transmission, and time to power. Every figure sourced.
You get a shareable report
A web report with a verdict per criterion and a narrative summary, on its own link. Send it to your team, a broker, or your IC. Precomputed, so it comes back fast.
Grid capacity, modeled the way the ISO models it
Available capacity and interconnection feasibility at every point of interconnection, modeled on ISO and RTO base-case grids the way the grid operator models them. Injection and offtake, by year and by scenario. No black box.
- ✓Follows ISO and RTO procedures. ATC and offtake methodology, not a heuristic.
- ✓Every scenario. Base case, post-contingent, existing system, and queued.
- ✓Every study year. Capacity modeled 2026 through 2033, not a single snapshot.
- ✓Accurate bus mapping. High-accuracy grid data and location accuracy at each point of interconnection.
- ✓Injection and offtake. Both directions of capacity, network resource and energy resource.
Private and secure by default
It's free, but your data isn't the product. The sites you check stay yours.
We never train on your data
Your sites, uploads, and searches are never used to train AI models. Not ours, not anyone's.
Private to you
Reports live in your account, visible only to you and the teammates you invite. Never shared, never sold.
Discreet by design
No one sees which sites you're evaluating. Not other users, not landowners, not competitors.
Encrypted end to end
Data is encrypted in transit and at rest, on infrastructure built for sensitive site data.
SOC 2 Type 2 compliant
Independently audited to SOC 2 Type 2. Least-privilege internal access, logged.
Yours to delete
Remove any report, or your whole account, anytime. Your data leaves when you do.
Power now. More coming.
Each report covers one theme. Power is live and free. Pick another theme when it ships, or talk to us about running them together.
Power
Live · FreeTime to power across 8 criteria: grid context, POIs and headroom, interconnection queue, pricing, generation, transmission, and planned upgrades.
See an example →Behind the Meter
Coming soonGas pipelines, non-attainment zones, and compression stations: what it takes to run behind the meter.
Community & Permitting
Coming soonLocal sentiment and the permitting path: who decides, what's on record, and where projects stall.
Landowner
Coming soonOwnership details for the parcel and its neighbors, scrubbed from public records.
Geo-tech & Civil
Coming soonSoils, geotech, and civil constraints that shape what you can actually build.
Topography & Ecology
Coming soonTerrain, water, and environmental constraints across the parcel.
One theme per free report. Want every theme on one site, plus API access and a Powerflow study? .
Frequently asked questions
What is the free Power report?
What do I need to run one?
What does "agent-first" mean?
An AI wrote my report. Why should I trust it?
Where does the data come from?
How accurate is it?
How fast is it?
What's free, and what's enterprise?
What happens to my data?
Is there an API?
Power was the bottleneck. Now it's free, and it comes back the same day.
The analysis that gated every data center deal now takes hours, not weeks, and costs nothing. Run your site before the next person runs theirs.