| # | Project | Customer | Status | Technology | Energy Source | Total MW | Dist (mi) | Phases |
|---|---|---|---|---|---|---|---|---|
| 1 | Azio Modular Data Center | Azio AI | Announcement | Simple Cycle | Natural Gas | 11 | 3.8 | 1 |
| 2 | Port of Victoria Campus | Crusoe | Announcement | Combined Cycle, Small Modular Reactor | Natural Gas, Nuclear | 2,600 | 7.5 | 3 |
| Project | Phase | Status | Technology | Energy Source | MW | Announced | Est. Activation | Dist (mi) |
|---|---|---|---|---|---|---|---|---|
| Azio Modular Data Center | Phase 1 | Announcement | Simple Cycle | Natural Gas | 11 | 2026-05-13 | — | 3.8 |
| Port of Victoria Campus | Phase 1 | Announcement | Small Modular Reactor | Nuclear | 300 | 2026-05-05 | 2032-12-31 | 7.5 |
| Port of Victoria Campus | Phase 1 | Announcement | Combined Cycle | Natural Gas | 1,100 | 2026-05-05 | 2030-12-31 | 7.5 |
| Port of Victoria Campus | Phase 2 | Announcement | Small Modular Reactor | Nuclear | 1,200 | 2026-05-05 | 2034-12-31 | 7.5 |
2 verified data-center BTM projects found within 25 miles across all statuses: Azio Modular Data Center (Azio AI, 11 MW natural gas, ~3.8 mi, Announced) and Port of Victoria Campus (Crusoe/Blue Energy, gas-to-nuclear up to 1.5 GW, ~7.5 mi, Announced). Both are announced projects with BTM generation planned. The count of 2 meets the ≤2 threshold.
Project 1 — Azio Modular Data Center: Azio AI is deploying modular AI data center capacity at a South Texas site (~3.8 mi from the target parcel) utilizing behind-the-meter natural gas generation colocated at an operational oil field. The initial deployment is 5 MW of data center capacity backed by 11 MW of simple-cycle natural gas generation. Envirotech Vehicles, the site host, has signed a non-binding LOI to acquire Azio AI in a $480M merger. Broader plans include "Atlas One," a 500+ acre campus engineered for up to 500 MW of BTM power. Both the project identity and data-center BTM relationship are publicly corroborated.
Project 2 — Port of Victoria Campus (Crusoe / Blue Energy): AI data center developer Crusoe has partnered with nuclear energy firm Blue Energy to develop an up to 1.5 GW nuclear-powered data center campus at the Port of Victoria (~7.5 mi from the target parcel). Blue Energy will initially deliver power through combined-cycle natural gas generation (1,100 MW target by 2030), transitioning to nuclear (GE Vernova Hitachi BWRX-300 SMRs, up to 1,500 MW by 2032–2034). Blue Energy has submitted a construction permit application to the NRC, and the project has filed Texas Chapter 313 tax abatement applications with Bloomington ISD. The 1,600-acre campus is designed as an AI factory with 10 data center buildings at 250 MW each. Both project identity and BTM relationship are publicly corroborated.
Gas-demand context: The Azio project's gas requirement is modest (11 MW simple cycle). The Port of Victoria Campus's gas bridge phase (1,100 MW combined cycle) represents significant near-term gas demand, though the planned transition to nuclear would reduce long-term gas consumption. Neither project has confirmed shared gas delivery points with the target site; supply-path relationship is unresolved.
Measurement: WGS 84 / UTM zone 14N (EPSG:32614), utm | Transformation Applied: EPSG:4326→EPSG:32614 (0.0 m)