| # | PROJECT | TYPE | MW | STAGE | DIST | SOURCE |
|---|---|---|---|---|---|---|
| 1 | Blue Energy Center - Phase 3 – Steam Stage 2 | Nuclear | 1,320.0 | Queued | 2.0 | ERCOT |
| 2 | Iguala Solar | Solar | 250.0 | Queued | 3.2 | ERCOT |
| 3 | Oak Belt Solar | Solar | 181.0 | Queued | 3.4 | ERCOT |
| 4 | HyFuels Calhoun Solar | Solar | 301.8 | Queued | 3.5 | ERCOT |
| 5 | Crossroads Wind | Wind | 277.4 | Queued | 3.5 | ERCOT |
| 6 | Marcos Solar SLF | Solar | 216.1 | Queued | 3.5 | ERCOT |
| 7 | New Hickory Solar | Solar | 206.0 | Prefiling | 22.4 | ERCO |
7 solar, wind, or nuclear projects with queued or prefiling status were identified within 25 miles of the site. 6 are in the ERCOT interconnection queue. 1 are in EIA-860 proposed/planned status (prefiling). Total proposed capacity is 2,752.3 MW.
The area shows strong renewable energy development activity, with multiple solar projects progressing through the ERCOT interconnection queue. A notable nuclear project (Blue Energy Center Phase 3, 1,320 MW) is in early queue stages (screening study started). The Crossroads Wind project (277 MW) has completed its feasibility and system impact studies and has an executed interconnection agreement, indicating advanced development. Most projects are geocoded to county centroids, so exact locations may differ from the map display.
Measurement: WGS 84 / UTM zone 14N (EPSG:32614), utm