PowerFree reportInteractive

Example site

Texas · ERCOT · Generated 2026-08-27
Power is reachable here, but the queue governs the timeline. This site sits in ERCOT's Houston Load Zone with connectivity to 11 target POIs (4 phase-capable) and 84 transmission lines ≥138 kV within 25 miles, but faces a major headwind: 58,772 MW of interconnection queue across 40 POIs creates acute competition for limited offtake capacity. Time-to-power is estimated at 30-48 months at LINNVILLE 138 kV (308 MW offtake), and the adjusted zonal LMP averages $36.7/MWh. The critical watch-item is queue-clearing velocity under five planned 345 kV+ transmission upgrades tracked by ERCOT's Transmission Project Information Tracking (TPIT); those upgrades will drive POI headroom release.
Every report is a shareable link. Send it to your team, a broker, or your IC. Private until you share it.

Run this on your own site

Drop a KMZ, address, or lat-long and get the same interactive Power analysis back, free. Other themes are coming; talk to us if you want them together.

Get my free Power report

Generated by Geoforge · example site · This report is for informational purposes only.