Planned Transmission Upgrades

✓ High Activity — 7 upgrades within search radius (capacity data unavailable) ⚠️ Major upgrade flagged
Criteria: Count of planned transmission upgrades within the site search radius from the applicable ISO/RTO transmission plan. Thresholds: ≤1 = No Published Plan / No Data, 2–3 = Low Activity, 4–5 = Moderate Activity, 6+ = High Activity. Direction: higher is better.
Source: Planned Transmission Upgrades
Site Assessment
✓ High Activity
7 upgrade(s) within 25 mi search radius
ISO/RTO
ERCOT Published Plan
Transmission Project Information Tracking (TPIT)
Voltage Breakdown
2x 138 kV, 4x 345 kV, 1x 69 kV ⚠ Major
4 upgrades at 345 kV flagged as major
Planning Horizon
All Near-Term
7 Near (2025-2029)
Capacity Impact
Data Unavailable
ERCOT TPIT does not publish project-level MW impact

Summary

Planned Transmission Upgrades (25 mile radius)

Project Name Voltage Status In-Service Owner Route Miles Tier
Upgrade San Diego - Orange Grove SW 69 kV Planned 2029 STEC San Diego → Orange 21.6 Tier 4
West Columbia to Damon and Needville to Big Creek Ckt.89A Upgrades 138 kV Planned 2027 CNP West Columbia → Damon 6.6 Tier 4
Rebuild/reconductor Ckt.89A West Columbia to Damon and Ckt.89A Damon to Needvill 138 kV Planned 2028 CNP West Columbia → Needville 13.8 Tier 3
Facility Ratings Methodology Phase 2 (FRM2) Upgrades 345 kV ⚠️ Planned 2026 CNP STP → Hillje Tier 4
Facility Ratings Methodology Phase 2 (FRM2) Upgrades 345 kV ⚠️ Planned 2029 CNP STP → Hillje Tier 4
Charger Solar Interconnection 345 kV ⚠️ Under Construction 2025 AEP TCC Angstrom → STP Tier 4
Angstrom to STP: Increase 345 kV Line MOT 345 kV ⚠️ Planned 2025 AEP TCC Angstrom → STP Tier 4

Analysis

ERCOT TPIT shows 7 planned transmission upgrades within 25 miles of the site, spanning 2x 138 kV, 4x 345 kV, 1x 69 kV. All projects are in the Near (2025-2029) horizon. Four 345 kV upgrades are flagged as major, including FRM2 upgrades at STP-Hillje and the Charger Solar/Angstrom-STP interconnections. Capacity impact data is not available in the ERCOT TPIT dataset.

The site falls within ERCOT’s jurisdiction, which maintains a published Regional Transmission Plan (RTP) and tracks projects through the Transmission Project Information Tracking (TPIT) system. Seven planned upgrades intersect the 25-mile search radius, spanning 69 kV to 345 kV voltage classes. All seven projects are in the near-term planning horizon (2025–2029).

Four of the seven upgrades operate at 345 kV and are flagged as major upgrades per the methodology (345 kV+). These include two Facility Ratings Methodology Phase 2 (FRM2) upgrades on the STP–Hillje 345 kV corridor, the Charger Solar Interconnection (under construction, 2025), and the Angstrom–STP 345 kV line MOT increase. The remaining upgrades include two 138 kV reconductoring/rebuild projects on the West Columbia–Damon–Needville corridor by CenterPoint Energy, and a 69 kV upgrade by STEC on the San Diego–Orange Grove segment.

Capacity impact (MW) data is not published in the ERCOT TPIT dataset. The capacity envelope cannot be computed for these upgrades. Utility-level engineering studies or ERCOT planning cases would be needed to estimate MW impact.