| Rank | Substation | Voltage | County | Load Zone | Distance | Role |
|---|---|---|---|---|---|---|
| 1 | CANEY | 138 kV | MATAGORDA | ERCOT Houston | 3.7 mi | Nearest |
| 2 | Tenaris Substation | 138 kV | MATAGORDA | ERCOT Houston | 4.4 mi | Supporting |
| 3 | VAN VLECK | 69 kV | MATAGORDA | ERCOT Houston | 4.6 mi | Supporting |
| 4 | ALLENHURST | — | MATAGORDA | ERCOT Houston | 5.2 mi | Supporting |
| 5 | Hilcorp Substation | 60 kV | BRAZORIA | ERCOT Houston | 7.7 mi | Supporting |
All four grid-context identifiers resolved cleanly for the site: ERCOT Houston load zone (nearest substation: CANEY, 3.7 mi), CenterPoint Energy Houston Electric as TDU, Public Utility Commission of Texas (PUCT), Matagorda County, TX. No cross-identifier contradictions were found.
Nearest viable substation is CANEY (138 kV, 3.7 mi from site centroid). Electric Load Zone attribute resolves to ERCOT Houston, confirming ERCOT market.
Site intersects 3 distinct TDU service territories: CenterPoint Energy Houston Electric, Texas-New Mexico Power Company (TNMP), AEP Texas. HIFLD service territory boundaries overlap significantly in this area. Primary TDU determined as CenterPoint Energy Houston Electric based on most specific (smallest) territory polygon. Market type: deregulated (ERCOT).
State is Texas (TX). Regulatory body: Public Utility Commission of Texas (PUCT).
Site centroid and full polygon fall within Matagorda County, TX (FIPS 48321).
Measurement: WGS 84 / UTM zone 15N (EPSG:32615), utm