Count A (raw radius, all voltages/statuses): 86 → Count B (≥69 kV, in-service/UC): 81 → Count C (curated): 72
| # | NAME | kV | DIST (MI) | COUNTY | ROLE |
|---|---|---|---|---|---|
| 1 | CANEY | 138 | 3.7 | MATAGORDA | Resolving |
| 2 | Tenaris Substation | 138 | 4.4 | MATAGORDA | Supporting |
| 3 | VAN VLECK | 69 | 4.6 | MATAGORDA | Supporting |
| 4 | Bay City | 138 | 7.8 | MATAGORDA | Supporting |
| 5 | Magill Substation | 138 | 8.2 | MATAGORDA | Supporting |
| 6 | Peyton Creek Wind GSU | 345 | 8.6 | MATAGORDA | Supporting |
| 7 | OLD OCEAN 2 | 138 | 8.7 | BRAZORIA | Supporting |
| 8 | LINNVILLE | 138 | 8.8 | BRAZORIA | Supporting |
| 9 | Phillips No 5 | 138 | 8.9 | BRAZORIA | Supporting |
| 10 | Phillips No 2 | 138 | 8.9 | BRAZORIA | Supporting |
| 11 | P66 SUBSTATION #2 | 69 | 8.9 | BRAZORIA | Supporting |
| 12 | OLD OCEAN | 138 | 8.9 | BRAZORIA | Supporting |
| 13 | SUBSTATION #6 | 69 | 8.9 | BRAZORIA | Supporting |
| 14 | Old Ocean | 138 | 9.0 | BRAZORIA | Supporting |
| 15 | FM 524 Substation | 138 | 9.0 | BRAZORIA | Supporting |
| UTILITY | TYPE | OVERLAP | CONTROL AREA |
|---|---|---|---|
| AEP TEXAS CENTRAL COMPANY | INVESTOR OWNED | 100% | NOT AVAILABLE |
| JACKSON ELECTRIC COOP, INC - (TX) | COOPERATIVE | 100% | ERCO |
| WHARTON COUNTY ELEC COOP, INC | COOPERATIVE | 100% | ERCO |
| TEXAS-NEW MEXICO POWER CO | INVESTOR OWNED | 100% | NOT AVAILABLE |
| CENTERPOINT ENERGY | INVESTOR OWNED | 100% | NOT AVAILABLE |
| IDENTIFIER | VALUE |
|---|---|
| Balancing Authority | ERCO |
| ISO/RTO | ERCOT |
| Load Zone | LZ_HOUSTON |
| Wires Utility (TDU) | AEP TEXAS CENTRAL COMPANY, JACKSON ELECTRIC COOP, INC - (TX), WHARTON COUNTY ELEC COOP, INC, TEXAS-NEW MEXICO POWER CO, CENTERPOINT ENERGY |
| Transmission Owner | Not resolved |
| State PUC | Public Utility Commission of Texas |
| County | Matagorda |
| County FIPS | 48321 |
| State | Texas |
Site falls within the ERCOT (ERCO) balancing authority, load zone LZ_HOUSTON, TDU is ambiguous among 5 utilities (verification required), in Matagorda County, Texas. 3 of 4 identifiers resolved with no cross-consistency contradictions. CANEY (138 kV, 3.7 mi) is the nearest curated substation.
The substation universe construction identified 86 substations within the 25-mile search radius. After filtering to ≥69 kV in-service or under-construction units (81), structural curation removed switchyards, taps, and pseudo-bus entries, yielding 72 curated substations (Set C).
3 of 4 grid identifiers resolved cleanly. The site is in ERCOT (ERCO) territory, load zone LZ_HOUSTON. The serving utility is ambiguous among 5 overlapping service territory polygons (known HIFLD artifact for this region) and requires TDU verification. Matagorda County (FIPS 48321) and the Public Utility Commission of Texas resolved cleanly from the US County Boundaries core layer.
Measurement: WGS 84 / UTM zone 15N (EPSG:32615), utm | Transformation Applied: → (0.0 m)